ERECTING A LAUNCHING GANTRY IN TIGHT QUARTERS

TWO TEREX® AC 500-2 all terrain CRANES HELP WITH CONSTRUCTION

ON THE RIYADH METRO PROJECT

ZWEIBRÜCKEN, June 29, 2016 – One of the world’s largest infrastructure projects is happening right now in Riyadh, Saudi Arabia — an 85 km light-rail public system known as the Riyadh Metro, or King Abdulaziz Public Transport Project. Planning for the $22.5-billion-dollar project started in 2013 when the BACS consortium, comprised of Bechtel, Almabani General Contractors, Consolidated Contractors Company and Siemens (BACS) was awarded the contract for design, construction, train cars, signaling, electrification and integration of the new lines to the system. To meet the aggressive timeline of completing construction by the end of 2018, the BACS consortium has enlisted the expertise of subcontractors on the project.

To aid in the erection of a launching gantry for a light-rail bridge, the BACS consortium hired local lifting solutions specialists, Mohammad Abdullah Al Areedh Lte. Co. to raise the 142 tonnes beams and supporting winch 16.75 m in the air using two Terex® AC 500-2 all terrain cranes.

Tight Operations

The launching gantry lifts required roads to be closed, creating the need for urgency on this part of the massive construction project. “Our ability to quickly transport, setup and rig the cranes was critical to the overall project and our reputation in the market,” says Mohammed I Alrasheed, operations manager at Mohammad Abdullah Al Areedh. “We were able to drive both cranes to the site and used five flatbeds per crane for transporting additional material, such as counterweight. Once on site, we had both cranes ready to work within four hours with the hard work of five people, which was much faster than what we estimated.”

One of the more challenging aspects of the job was the tight setup and working conditions. “Our crew was working in the middle of the road, so there was very little room for cranes and operators to maneuver,” explains Alrasheed. “That was one of the reasons we selected the Terex AC 500-2 cranes from our fleet. That particular model has a compact base, which made it easier to position than some of the other cranes in our fleet.”

 

Working Together

The cranes were configured to a boom length of 37.9 m and outfitted with 180 tonnes of counterweight. Alrasheed also noted that each crane was equipped with the Terex Sideway Superlift (SSL) telescopic boom attachment.

To secure the beams to the supporting bases, the cranes worked in tandem to lift each beam 16.75 m at a radius of 16 m and 18 m, respectively. The weight of the beams was evenly distributed and each crane was responsible for 71 tonnes. It took the Mohammad Abdullah Al Areedh crew of seven just 10 days to complete the project. The BACS consortium was pleased with the outcome and crew’s professionalism.

 

Cranes on the Job

The Terex AC 500-2 cranes used to install the launching gantry on the Riyadh Metro project is part of the company’s extensive line of all terrain cranes. With a carrier length of just 17.1 m, the crane is the most compact eight-axle crane in its class. It has an impressive system length of 145.8 m through the use of the unit’s luffing fly jib. The crane offers enormous power across the full lifting capacity range because of the design of the main boom cross-section and the reinforced SSL. Short setup times and the IC-1 control system's ease of use make for smooth crane operations and comfortable working conditions. The drive design of the crane provides outstanding transfer of engine power, yielding excellent performance on both the highway and the jobsite.

 

Constructing the light-rail system

With an anticipated population increase from 5.7 million people to 8.2 million by 2030, Riyadh city officials have deemed the project urgent to alleviate traffic congestion. A total of 833 Saudi engineers are being engaged on the project. Work began in 2014 and is expected to be completed by the end of 2018.

 

Mohammad Abdullah Al Areedh has been showing its trust in Terex Cranes, with three AC 500-2 and two AC 700 purchased in 2015, as well as seven AC 100/4 purchased in 2014.

About Mohammad Abdullah Al Areedh Lte. Co.

Since 1976, Mohammad Abdullah Al Areedh has specialized in lifting solutions and heavy equipment operations. Since then, the company has expanded to include seven locations and employ more than 2,000 people. Al Areedh believes that its knowledgeable crew and record of on-time project completion has helped the company grow to the size it is today. Another important company philosophy is providing customers with the latest equipment models.

 

About Terex

Terex Corporation is a lifting and material handling solutions company reporting in five business segments: Aerial Work Platforms, Construction, Cranes, Material Handling & Port Solutions and Materials Processing. Terex manufactures a broad range of equipment serving customers in various industries, including the construction, infrastructure, manufacturing, shipping, transportation, refining, energy, utility, quarrying and mining industries. Terex offers financial products and services to assist in the acquisition of Terex equipment through Terex Financial Services. Terex uses its website (www.terex.com) and Facebook page (www.facebook.com/TerexCorporation) to make information available to its investors and the market.

 

\\terex.local\zwb.zweibrueckenuserdata\damien.bizjak\Desktop\supermailer\riyadh\Terex Cranes Job Story - Two AC 500-2 all terrain cranes help with construction on metro project.jpg

Máquinas de construção on-line

Escolha a linguagem

E-Mail: alina@global-ce.com TEL: 0086-10-84673349,18701576687
lmjx.net Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China